<cite id="4v9q3"></cite>

  • <table id="4v9q3"></table>

    1. <object id="4v9q3"><strong id="4v9q3"></strong></object>
        二維碼
        0769-8855 7180
        assembly line
        01
        Pre-charge
        02
        High TemperatureStanding
        03
        Formation
        04
        OCV Testing
        05
        Normal Temperature Standing
        06
        Capacity Grading
        07
        NG Sorting
        Circular battery into volume dividing system
        流水線
        01
        High TemperatureStanding
        02
        Nail Pulling
        03
        Nail Inserting
        04
        Formation
        05
        Out
        06
        In
        07
        Leakage Testing
        08
        2nd Filling
        09
        Seal Nail Welding
        10
        OCV Testing
        11
        Normal Temperature Standing
        12
        Capacity Grading
        13
        Film Wrapping
        14
        DCIR Testing
        15
        NG Sorting
        Square cell into capacity dividing system
        img
        01
        High TemperatureStanding
        02
        thermal pressure Formation
        03
        OCV Testing
        04
        Discharger
        05
        Degass
        06
        Trayfiller
        07
        Side voltage test
        08
        Re-sealing Machine
        09
        Normal TemperatureStanding
        10
        Capacity Grading
        11
        DCIR Testing
        12
        Sorting
        Soft pack battery into capacity dividing system
        Software system structure
        logistics system
        Product Center

        Professional R&D and manufacturing of energy recovery type formation, capacity separation, sorting and other lithium battery back-end production line equipment

        ±0.05%FS

        Current Accuracy

        Current Accuracy

        ±1mV

        Voltage Accuracy

        Voltage Accuracy

        85%

        Charging Efficiency

        Charging Efficiency

        80%

        Discharge Efficiency

        Discharge Efficiency

        Self-developed database
        System, scheduling system

        Software System

        Software System

        有BYD\CATL\SONYOther domestic and foreign
        mainstream manufacturers' production line design experience

        Charging Efficiency

        Charging Efficiency

        • Dongguan No. 1 Factory

          Guohong Industrial Zone, Wangniudun Town, Dongguan City
        • Dongguan Second Factory

          Getina Industrial Zone, Wangniudun Town, Dongguan City
        Guangya Intelligent

        ABOUT US

        Dongguan Guangya Intelligent Technology Co., Ltd. is a lithium battery testing and testing equipment manufacturer integrating sales, R&D, manufacturing and service. It specializes in R&D and manufacturing of energy recovery type formation, capacity classification, sorting and other lithium battery back-end production line equipment. A comprehensive company that can provide one-stop service for automated production lines of battery back-end production. The company is located in Wangniudun Town, Dongguan, in the west of Dongguan City. Guangya company has 20,000 square meters of workshops and nearly 3,000 square meters of staff dormitories. The company has advanced automated production equipment and testing instruments, a scientific production management system and a strict quality assurance system。
        See more

        0BOX/month

        0CH/month

        1A-10A equipment capacity

        0BOX/month

        0CH/month

        10A-400A equipment capacity

        0

        Plant area
        二維碼
        Guangya Smart Official WeChat
        0769-8855 7180

        Contact address: No. 2 Taihe Road, Hengli Village, Wangniudun Town, Dongguan (in the courtyard of Guohong Building)

        Contact: Miss Yang

        email:yang_hl@lai-tech.com.cn

        Contact information:0769-8855 9380

        Online message
        Copyright ? 2020Dongguan Guangya Intelligent Technology Co., Ltd. Technical Support:MiKe Network
        日韩欧美精品一中文字目